Wednesday 5 June 2013

{ under construction }

It's been a while since I've written but we've been busy working on our shed.

We spent a few weeks pouring over the design and drawing multiple iterations of plans. We also met with a few contractors and settled on a recommendation from our neighbours. Two weekends ago, D and some of his friends tore down the old shed, dug out the foundation area, built the frame for the concrete and during the week the concrete was poured. 

Two days ago, our contractor built the shed frame. 



Yesterday, they put up the remaining OSB walls.



Today, they're working on the roof and wrapping the structure with a vapour barrier.

We've selected a double solid door for the left side of the shed and for the single door on the right, we've selected a door with a glass insert in an Oak Park-inspired design. Not the door below but the same design of glass.



For the siding, we've selected a cedar shake style in khaki.